Updates

 The following updates have been made:

  • 2009 Roof on main house replaced
  • 2009-08 Covered the open steps down the yard
  • 2009-09 Chimney cap added
  • 2009-10 Waterproofed underside of deck
  • 2013-05 Central air installed
  • 2013 Repainted throughout
  • 2013 Added bidet to upstairs toilet
  • 2014 Replaced the existing carport
  • 2014-01 Replaced upstairs toilet
  • 2014-02 Replaced downstairs toilet with single piece unit.
  • 2014-08 Replaced solar windows
  • 2015-04 Replaced dock lumber
  • 2016-09 Roof over mud room replaced (metal)
  • 2017-06 Replaced lower bathroom floor
  • 2017-06 Added bidet to downstairs toilet
  • 2019-06 Replaced cladding and insulation at roadside deck
  • 2019-09 Replaced cladding and insulation below deck
  • 2019-11 Hot water heat pump installed
  • 2023-05 Pergola added to deck
  • 2024-05 Heat pump installed on main level