The following updates have been made:
- 2009 Roof on main house replaced
- 2009-08 Covered the open steps down the yard
- 2009-09 Chimney cap added
- 2009-10 Waterproofed underside of deck
- 2013-05 Central air installed
- 2013 Repainted throughout
- 2013 Added bidet to upstairs toilet
- 2014 Replaced the existing carport
- 2014-01 Replaced upstairs toilet
- 2014-02 Replaced downstairs toilet with single piece unit.
- 2014-08 Replaced solar windows
- 2015-04 Replaced dock lumber
- 2016-09 Roof over mud room replaced (metal)
- 2017-06 Replaced lower bathroom floor
- 2017-06 Added bidet to downstairs toilet
- 2019-06 Replaced cladding and insulation at roadside deck
- 2019-09 Replaced cladding and insulation below deck
- 2019-11 Hot water heat pump installed
- 2023-05 Pergola added to deck
- 2024-05 Heat pump installed on main level
![]() |
| Installing the heat pump |